4.4
MAINTENANCE
To. guarantee. functioning. and. efficiency. of.
the.appliance,.in.respect.of.the.legal.provi-
sions.in.force,.it.must.be.regularly.checked;.
the.frequency.of.the.checks.depends.on.the.
type. of. appliance. and. the. installation. and.
usage.conditions.
In.any.case,.it.should.be.inspected.at.least.
once.a.year.by.a.qualified.technician.
Carry. out. the. cleaning. of. the. generator. in.
the.following.way:
–. Turn.the.main.switch.off.to.stop.electric.
power. reaching. the. boiler. and. close. the.
gas.feed.cock.
–. Remove.the.outer.casing.and.the.gas.bur-
ner. manifold. unit.. To. clean. the. burner,.
blow.in.a.jet.of.air,.so.as.to.remove.any.
dust. particles. that. may. have. accumula-
ted.
–. Clean.the.heat.exchanger,.removing.any.
dust. or. residue. from. combustion.. When.
cleaning.the.heat.exchanger.or.the.bur-
ners,.chemical.products.or.steel.brushes.
MUST.NOT.BE.USED.
. Make. sure. that. the. tops. of. the. burners.
with. the. holes. are. free. from. encrusta-
tions.
–. Reassemble.the.items.removed.from.the.
boiler,.making.sure.to.follow.the.correct.
sequence.
–. Check.operation.of.the.main.burner.
–. After.assembly.of.all.the.gas.connections,.
these. must. be. tested. for. soundness,.
using. soapy. water. or. appropriate. pro-
ducts..DO.NOT.USE.NAKED.FLAMES.
–. Do. not. use. calcium. chloride. to. treat.
the. plastic. component. during. generator.
maintenance..
4.4.1 Chimney sweep function (fig. 22)
To. check. boiler. combustion,. press. the.
installer’s.key.
5
3
1
2
4
.for.a.few.seconds..
The.chimney.sweep.function.will.switch.on.
and.will.continue.for.15.minutes.
.
From.that.
moment,. the. boiler. will. start. working. in.
heating.mode.at.maximum.power,.with.cut.
off.at.80°C.and.re-ignition.at.70°C.
Before activating the chimney sweep fun-
ction make sure that the radiator valves or
eventual zone valves are open.
The. test. can. also. be. carried. out. with. the.
boiler.working.in.D.H.W..mode..
For.this,.after.activating.the.chimney.sweep.
function,. open. one. or. more. hot. water. fau-
cets..Under.these.conditions,.the.boiler.will.
function.at.maximum.power.with.the.D.H.W..
kept.at.between.60°C.and.50°C..During.the.
test,. the. hot. water. faucets. must. remain.
open.
If.the.key
.
5
3
1
2
4
.
and
.
5
3
1
2
4
.
are.pressed.during.the.
15.minutes.of.the.chimney.sweep.function,.
the. boiler. will. be. brought. respectively. to.
maximum.and.minimum.power.
The chimney sweep function will automati-
cally switch off after 15 minutes or when
the key .
5
3
1
2
4
.is pressed again.
4.4.2 Cleaning the filter “Aqua Guard
Filter System” (fig. 23)
To.clean.the.filter,.close.the.delivery/return.
on/off.taps,.turn.off.the.power.to.the.control.
panel,. remove. the. casing. and. empty. the.
boiler.using.the.drain.provided..
Place.a.container.for.collection.underneath.
the. filter,. unscrew. the. cap. and. proceed. to.
clean. the. filter,. removing. impurities. and.
limestone.deposits..
Check.the.seal.o-ring.before.reassembling.
the.cap.with.the.filter.
4.4.3 Operation floor drying (fig. 23/a)
The.operation.floor.drying.keeps.the.floor.at.
a. pre-established. temperature. profile. and.
it.is.activated.only.for.those.systems.com-
bined. with. the. mixed. zone. card. ZONA.MIX.
code. 8092234.. The. temperature. profiles.
can. be. selected. by. means. of. the. installer.
parameter.PAR.43:.
0.=.Not.activated.function
1.=.Curve.setting.A
2.=.Curve.setting.B
3.=.Curve.setting.A.+.B
The. turning. off. of. . the. function. happens.
clicking.on.the.button.OFF.(return.of.PAR.43.
to.the.value.0).or.automatically.at.the.end.of.
the.function..
The.set.of.the.mixed.zone.follows.the.deve-
lopment.of.the.selected.curve.and.reaches.
a. maximum. of. 55°C.. During. the. function.
all. the. other. heating. demands. are. ignored.
(heating,. sanitary,. antifreeze. and. chimney.
sweep)..
During. the. functioning. the. display. shows.
the. remaining. days. for. the. completion. of.
the.function
.
(example.mains.digits.-15.=.15.
days. lack. to. the. end. of. the. function).
.
The.
diagram. fig.. 23/a. reports. the. development.
of.the.curve.
ATTENTION:
- Observe the relevant standards and
regulations of the floor manufacturer!
- Proper functioning is ensured only when
the plant is correctly installed (hydrau-
lic system, electrical installation, set-
tings)! If not observed, the floor might
get damaged!
Fig..23
Apre
2
2
2
Circuito
riscaldamento 2
Circuito
riscaldamento 3
(impianto tre
zone)
Fig..22
50
45
40
35
30
20
5
10
15
18
[Tag
]
0
25
55
A
B
1
1
5
7
X
A + B
1
25
[TVw]
Fig..23/a
TVw. Flow.temperature.setpoint
Tag
.
Period.in.days
x.
Start.day
A.
Functional.heating
B.
Floor.curing.heating
85
ES
PT
ENG
Summary of Contents for Murelle 25 OF
Page 1: ...MURELLE 25 30 OF ErP Fonderie SIME S p A Cod 6322862A 03 2017 ES PT ENG...
Page 2: ......
Page 35: ......