24
and be able to access the internal compo-
nents of the boiler.
4.5
MAINTENANCE
To guarantee functioning and efficiency of
the appliance, in respect of the legal provi-
sions in force, it must be regularly checked;
the frequency of the checks depends on
the type of appliance and the installation
and usage conditions (refer to the mainte-
nance schedual).
In any case, it should be inspected at least
once a year by a qualified technician.
During maintenance operations, it is
important to verify that the drip-plate
with drain trap contains water (this
check is particularly important if the
generator has not been used for exten-
ded periods of time).
If necessary, the drip plate can be filled
using the tap provided (fig. 20).
Fig. 19
ATTENTION
Before removing or refitting the front
panel of the boiler, open the small
upper plastic door.
Code 8106380
Model MURELLE GREEN PLANET I-HE 35 MF
Serial n. 9999999999
PAR 1 = 24 (NG) / 25 (LPG)
PAR 2 = 4
Page 33 of 40
Summary of Contents for Green Planet I-HE 35 MF
Page 39: ...Page 39 of 40...