– fit the front panel (8) fixing it to the sides
with pin clutches;
– complete the assembly by fixing the lid
(12) to the sides with pin clutches.
NOTE: Remove the “Testing Certificate”
from inside the combustion chamber and
keep together with the instructions manual.
2.6
ELECTRICAL CONNECTION
The boiler is fitted with an electricity cable,
and requires a 1ph - 230V - 50Hz power
supply through the main switch protected
by fuses.
The room thermostat (required for
enhanced room temperature control)
should be installed as shown in fig. 6.
Connect the burner with the cable supplied.
NOTE:
Device must be connected to an efficient
ear t hing sy s t em. SIME declines all
responsibility for injury caused to per-
sons due to failure to earth the boiler.
Always turn off the power supply before
doing any work on the electrical panel.
2.6.1
Electrical connection
to the BA boiler unit
To connect the boiler to the boiler unit pro-
ceed with the following operations:
– remove the casing lid of the boiler and
the back protection of the control panel
in order to have access to the terminal
board of the boiler;
– remove the protection of the boiler unit
to have access to the terminal board of
the boiler unit (fig. 7);
– connect the cables as shown in the dia-
gram (fig. 6/a).