11
than 6 m .
Preparing the truck for operation after delivery or transport
Procedure
–
Check the equipment is complete.
–
Check the hydraulic oil level.
–
Install the battery if necessary, (see "4.4 Battery removal and installation" on page
19).
–
Charge the battery, (see "4.3 Charging the battery" on page 18).
2.3During
2.3During
2.3During
2.3During brake-in
brake-in
brake-in
brake-in
We recommended operating the machine under light load conditions for the first stage
of operation to get the most from it. Especially the requirements given below should
be observed while the machine is in a stage of 100 hours of operation.
1.
Must prevent the new battery from over discharging when early used.
2.
Perform specified preventive maintenance services carefully and completely.
3.
Avoid sudden stop, starts or turns.
4.
Oil changes and lubrication are recommended to do earlier than specified.
5.
Limited load is 70
~
80% of the rated load.