32
007-5683-004
5: System Serverboard Information
ESD Precautions
•
Use a grounded wrist strap designed to prevent electrostatic discharge.
•
Touch a grounded metal object before removing any board from its antistatic bag.
•
Handle each printed circuit board (PCB) by the edges; do not touch the components,
peripheral chips, memory modules, or gold contacts on the PCB.
•
When handling chips or modules, avoid touching the pins.
•
Place the node board, expansion PCI cards, or other boards and components into antistatic
bags when not in use.
•
Make sure your computer chassis provides a conductive path between the power supply, the
case, the mounting fasteners, and the node board to chassis ground.
Unpacking
Caution:
The node board is shipped in antistatic packaging to avoid electrostatic discharge
damage. Be sure to use ESD precautions when you unpack replacement components for the
H2106-G7 server. Failure to do so can result in damage to the equipment.
Connecting the Control Panel
JF1 contains header pins for various front control panel connectors. See
for the pin
locations of the various front control panel buttons and LED indicators.
All JF1 wires have been bundled into a single cable to simplify this connection. Make sure the red
wire plugs into pin 1 as marked on the board. The other end connects to the Control Panel PCB
board, located just behind the system status LEDs on the chassis.
!
Summary of Contents for Rackable H2106-G7
Page 1: ...SGI Rackable H2106 G7 System User s Guide 007 5683 004 ...
Page 4: ......
Page 16: ......
Page 18: ......
Page 24: ......
Page 26: ...2 007 5683 004 1 Introduction Figure 1 1 Rackable H2106 G7 Server Top Removed ...
Page 32: ......
Page 41: ...Check the Node Board Setup 007 5683 004 17 Figure 2 3 Accessing the Inside of the System ...
Page 44: ......
Page 50: ......
Page 68: ......
Page 80: ......
Page 108: ......
Page 110: ......
Page 112: ......