16
007-5683-004
2: Server Installation
Check the Node Board Setup
Use the following sections to open the top cover and check that each node board is properly
installed and all the connections have been made.
Access the Inside of the Chassis
1.
Grasp the two handles on either side and pull the unit straight out until it locks (you will hear
a “click”).
2.
Depress the two buttons on the top of the chassis to release the top cover as shown in
3.
Lift the top cover from the chassis.
Note:
To remove the system from the rack completely, depress the locking tabs on the chassis
rails (push the right-side tab down and the left-side tab up) to continue to pull the system out
past the locked position.
Summary of Contents for Rackable H2106-G7
Page 1: ...SGI Rackable H2106 G7 System User s Guide 007 5683 004 ...
Page 4: ......
Page 16: ......
Page 18: ......
Page 24: ......
Page 26: ...2 007 5683 004 1 Introduction Figure 1 1 Rackable H2106 G7 Server Top Removed ...
Page 32: ......
Page 41: ...Check the Node Board Setup 007 5683 004 17 Figure 2 3 Accessing the Inside of the System ...
Page 44: ......
Page 50: ......
Page 68: ......
Page 80: ......
Page 108: ......
Page 110: ......
Page 112: ......