This chapter provides a quick setup checklist to get the H2106-G7 operational.
Unpack the System
Inspect the shipping container that the H2106-G7 was shipped in and note if it was damaged in
any way. If the server shows damage, file a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack that supports the weight, power requirements, and
environmental requirements of the H2106-G7 server. It should be situated in a clean, dust-free
environment that is well ventilated. Avoid areas where heat, electrical noise, and electromagnetic
fields are generated. Place the server rack near a grounded power outlet. Refer to
Prepare for Setup
The shipping container should include two sets of rail assemblies, two rail mounting brackets and
the mounting screws that you will use to install the system into a rack.
Read this section in its entirety before you begin the installation procedure.
Choose a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door completely (~25
inches) and approximately 30 inches of clearance in the back of the rack to allow for sufficient
airflow and ease in servicing.
Summary of Contents for Rackable H2106-G7
Page 1: ...SGI Rackable H2106 G7 System User s Guide 007 5683 004 ...
Page 4: ......
Page 16: ......
Page 18: ......
Page 24: ......
Page 26: ...2 007 5683 004 1 Introduction Figure 1 1 Rackable H2106 G7 Server Top Removed ...
Page 32: ......
Page 41: ...Check the Node Board Setup 007 5683 004 17 Figure 2 3 Accessing the Inside of the System ...
Page 44: ......
Page 50: ......
Page 68: ......
Page 80: ......
Page 108: ......
Page 110: ......
Page 112: ......