Instruction Manual StackGuard 2 System
10198E/3
29
5.1
Servicing schedule
After the installation has been started up, the first two servicing chores listed
here (recalibration and check of the ring pipe) should be carried out at 14-day
intervals. If the check values are in order, the interval can be successively
increased to the intervals listed in the table :
When
Who
What
Purpose
Every 3
months / at
every
opportunity
User
Check the zero and
reference points
(
Section 5.2)
Absolutely necessary for
maintaining measuring
accuracy
Every 3
months or
as needed
User
Check of ring pipe
(
Section 5.3)
Absolutely necessary for
maintaining measuring
accuracy
Annually
User
Replace filter for
purge air blower
(
Section 5.4)
Absolutely necessary to
protect the blower
As needed
or after a
warning
message
User
Replace desiccant
(
Section 5.5)
Absolutely necessary for
maintaining measuring
accuracy
Annually or
as needed
User
Replace purge air
filter (
Section
Absolutely necessary for
maintaining measuring
accuracy
Annually or
as needed
Service
technician
Major cleaning
Absolutely necessary for
maintaining measuring
accuracy
Every 10
years
Service
technician
Replace the back-
up battery in the
photometer
Necessary to make sure the
internal clock keeps running
during power outages
Table 2: Servicing schedule.