Instruction Manual StackGuard 2 System
10198E/3
11
3
Installation/Start-up
3.1
Placement
The StackGuard 2 system must be installed at a weather-protected location on
a flat surface with sufficient load-bearing capacity.
3.2
Electrical connections
3.2.1
Instrument connections
Installation and initial start-up are carried out by an installation technician from
the SIGRIST country representative. The procedure is described in the
separately available Service Manual.
Observe the servicing interval stated in the Service Manual (
Section 5) for
checking the ring pipe following initial start-up.
3.2.2
Connections provided by customer
Connecting live conductors causes grave danger to life and limb, and can
result in damage to parts of the installation!
Parts inside the photometer and the control unit may be energized with lethal
voltages. Before opening, make absolutely sure that no live conductors are
connected.