Install unit heaters to meet Occupational 

Safety and Health Act (OSHA). Unit heaters 

mounted less than 8 feet (2.4 meters) above 

the floor must be equipped with a fan guard. 

Ensure that all hardware used in the 

suspension of each unit heater is more than 

adequate. Failure to do so may result in 

extensive property damage, severe personal 

injury, or death. 

Suspension nuts are provided on the top of 

all models. Support rods should be installed 

so that they support the total weight of the 

unit  heater to assure that no strain is placed 

on the supply and return piping. Provisions 

for removal of the unit from the suspension 

rods may be desirable for future servicing. 

Otherwise, the provision of sufficient 

clearance around the unit heater for future 

maintenance and servicing is required. 

Note: 

Increasing clearance distances may 

be necessary if there is any possibility of 

distortion or discoloration of adjacent 

materials. 

It is assumed that the type of system to be 

used has been selected by the design 

engineer. The diagrams shown in the 

manual are for different types of steam or 

hot water systems. 

 

 

 

It is important that the system be kept clean 

and free of foreign substances, such as 

excessive joint materials, etc. 

For steam systems it is recommended that 

the unit be mounted level for proper 

condensate drainage. Swing joints should be 

used in piping, and piping should be pitched 

down so condensate can drain freely. 

Isolators are not required, but may be 

desirable for some applications. Refer to 

dimensional drawings for unit weights. 

Hanging hardware is not included with the 

unit (to be field supplied). 

Place unit heaters at points of greatest heat 

loss. Blanket outside doorways and provide 

ample coverage of window areas. Keep the 

unit heaters away from objects that will 

impede the full and natural air delivery of the 

units. 

P

IPING

 

Refer to the appropriate model dimensional 

drawing to determine the piping connection 

type, size, and location. Follow standard 

practices and codes when installing piping. 

Provide swing joints for expansion purposes, 

unions and shut-off valves for servicing 

purposes, as well as valves and traps for 

control purposes. Refer to Typical Piping 

Connections Diagrams for details. 

 

  

 

 

Unit Heaters 

Installation & Operation Manual 

2

 

www.sigmaproducts.com  Tel: (905) 453-0446   Fax: (905) 453-0675 

Rev 2 

Important:

 Unit heaters must be hung 

level from side to side, and front to back. 

Failure to do so will result in poor 

performance and/or premature failure of 

the unit. 

Summary of Contents for 30-H

Page 1: ...MANUFACTURERS OF HYDRONIC HEATING PRODUCTS Unit Heaters Installation and Operation Manual www sigmaproducts com Tel 905 453 0446 Fax 905 453 0675 Rev 2...

Page 2: ...y to provide any scaffolding or other apparatus to allow service or periodic maintenance to this equipment INSTALLATION Unit Heaters Installation Operation Manual 1 www sigmaproducts com Tel 905 453 0...

Page 3: ...kept clean and free of foreign substances such as excessive joint materials etc For steam systems it is recommended that the unit be mounted level for proper condensate drainage Swing joints should b...

Page 4: ...s where constant water circulation is used on the pain system A louvered cone air diffuser is available as an optional accessory for vertical unit heaters MAINTENTANCE Motor Lubrication Standard motor...

Page 5: ...an guard motor frame and fan bolts Check the fan for clearance in the panel orifice and free rotation The heater system should be checked once per year by a qualified technician All maintenance and se...

Page 6: ...7 50 15 5 0 50 40 9 18 23 40 H 1 22 13 5 4 75 8 7 50 15 5 1 25 40 10 23 29 47 H 2 27 16 5 5 00 8 5 7 75 16 25 1 25 48 10 23 29 58 H 2 27 16 5 5 00 8 5 9 50 18 0 1 25 48 10 28 35 62 H 2 31 5 19 5 5 62...

Page 7: ...13 625 3 375 V 44 125 30 4 125 2 2 5 1 2 13 UNC 3 9 125 3 480 V 44 125 30 4 125 2 2 5 1 2 13 UNC 3 13 625 3 DIMENSIONS IN MAX MTG HT FT MODEL K L M N P R S WT LB WITHOUT LOUVER WITH LOUVER 40 V 3 11 5...

Page 8: ...FIGURE 4 TYPICAL PIPING CONNECTIONS Unit Heaters Installation Operation Manual 7 www sigmaproducts com Tel 905 453 0446 Fax 905 453 0675 Rev 2...