60
For the rear feet, we’ll also press-fit in eight M5 nylock nuts with the rounded side facing outwards. You should
already have the bag of these medium-sized nuts open from earlier in the assembly.
Now, we’ll attach the two remaining motors to the rear feet. Install the coupler onto the motor first, followed by
the long bolts and spacers that were used for the X-axis motor assembly.
Put M5 nylock nuts into each nut catch on the rear feet
Loosely push the coupler over the motor shaft
Summary of Contents for LongMill V1
Page 1: ...1 LongMill V1 Assembly Manual V1 ...
Page 4: ...4 Part 1 XZ Axis Gantry ...
Page 22: ...22 The completed assembly should look like this ...
Page 29: ...29 Part 2 Y Axis Gantries ...
Page 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Page 40: ...40 Part 3 X Axis Rail ...
Page 43: ...43 Your completed rail should now look something like this ...
Page 57: ...57 Part 4 Y Axis Rails ...
Page 68: ...68 Part 5 Drag Chains and Wiring ...
Page 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Page 83: ...83 Part 6 Electronics ...
Page 93: ...93 Part 7 Table Mounting ...
Page 97: ...97 ...