5
M5-25mm bolt
Delrin anti-backlash nut
Parts Needed:
M5-nylock nut
Locking ACME nut &
set screw
x4
x4
x4
x8
Nut Assemblies
Start by opening up all the large hardware bags and spilling all the contents out onto the table. There should
be a bag full of medium-sized, long bolts and another with medium-sized nuts, this is the M5 hardware you
need. Another one of the bags will be filled with 4 rectangular plastic blocks, we’ll be preparing these blocks for
installing onto the XZ-axis gantry and eventually on the Y-axis as well.
Start by pressing the M5-nylock nuts into the hexagonal cutouts. Make sure that you point the round end of the
nut towards you, as you want the first part of the thread to be metal before your bolt gets to the nylon locking
part.
Summary of Contents for LongMill V1
Page 1: ...1 LongMill V1 Assembly Manual V1 ...
Page 4: ...4 Part 1 XZ Axis Gantry ...
Page 22: ...22 The completed assembly should look like this ...
Page 29: ...29 Part 2 Y Axis Gantries ...
Page 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Page 40: ...40 Part 3 X Axis Rail ...
Page 43: ...43 Your completed rail should now look something like this ...
Page 57: ...57 Part 4 Y Axis Rails ...
Page 68: ...68 Part 5 Drag Chains and Wiring ...
Page 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Page 83: ...83 Part 6 Electronics ...
Page 93: ...93 Part 7 Table Mounting ...
Page 97: ...97 ...