101
Now fasten the diagonal mounting points of all the right-side feet using the longer screws.
At this point, one side of your machine will be fully secure. The technique to make sure the other side is mounted
parallel to the first side is by running the gantry between its limits and mounting the other side as you move it
along the length. Start by mounting the top left foot on the inside:
Summary of Contents for LongMill V1
Page 1: ...1 LongMill V1 Assembly Manual V1 ...
Page 4: ...4 Part 1 XZ Axis Gantry ...
Page 22: ...22 The completed assembly should look like this ...
Page 29: ...29 Part 2 Y Axis Gantries ...
Page 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Page 40: ...40 Part 3 X Axis Rail ...
Page 43: ...43 Your completed rail should now look something like this ...
Page 57: ...57 Part 4 Y Axis Rails ...
Page 68: ...68 Part 5 Drag Chains and Wiring ...
Page 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Page 83: ...83 Part 6 Electronics ...
Page 93: ...93 Part 7 Table Mounting ...
Page 97: ...97 ...