46
M8-25mm bolt
X-axis rail
XZ-axis gantry assembly
Y-axis gantries
M8 nut
Parts Needed:
Previously Assembled
x8
x8
Sandwiching the rail with the Y-gantries
After the previous step, you should now have four major assemblies completed: the XZ-axis gantry, the two
Y-gantries, and the X-axis rail. These assemblies will all be coming together in this step, starting by sliding the XZ-
axis gantry assembly onto the X-axis rail.
DO NOT
stand the completed assembly up on the v-wheels, it can roll away or become unbalanced which may
cause it to fall and become damaged; just leave it laying on its back for the next steps. You can consider propping it
up at an angle as well if you don’t want the weight of the assembly pressing on the back of the Z-axis motor mount.
Summary of Contents for LongMill V1
Page 1: ...1 LongMill V1 Assembly Manual V1 ...
Page 4: ...4 Part 1 XZ Axis Gantry ...
Page 22: ...22 The completed assembly should look like this ...
Page 29: ...29 Part 2 Y Axis Gantries ...
Page 34: ...34 Tighten until snug Don t overtighten Both sides should be mirrored ...
Page 40: ...40 Part 3 X Axis Rail ...
Page 43: ...43 Your completed rail should now look something like this ...
Page 57: ...57 Part 4 Y Axis Rails ...
Page 68: ...68 Part 5 Drag Chains and Wiring ...
Page 81: ...81 Now plug in the cables for the motors on the two Y axis NEMA 23 stepper motors ...
Page 83: ...83 Part 6 Electronics ...
Page 93: ...93 Part 7 Table Mounting ...
Page 97: ...97 ...