Unpacking and installation preparation
1. Open crate
Move the crate as close to the prepared installation site as
possible. Ensure there is enough room to manuver the lifting
apparatus.
Remove/slide out all crate tubes to disassemble the cardboard
crate.
2. Lift Ultra 50 to vertical
Securely attach the lifting straps at the top of Ultra 50 to the
lifting apparatus and gently raise to a standing position on the
shipping baseplate.
The Ultra 50 must remain attached to the lifting equipment
until the mounting bolts have been installed.
NOTE:
The Ultra 50 is 2050mm/6.72ft tall on the shipping
baseplate.
Do not use the plug holders to assist lifting the charger at
any stage.
Once upright, remove all wrapping.
.
Lifting Straps
Shipping
Baseplate
Installation Manual
| VersiCharge Ultra 50™
15
Summary of Contents for VersiCharge Ultra 50
Page 2: ...2 ...