
Installing/Mounting
SITRANS WF100
22
Operating Instructions, 02/2012, 7ML19985NB01-01
Load cell handling
WARNING
Negative displacement on the load cell can functionally destroy the load cell. When
handling the load cell, care must be taken not to force the gap open.
Figure 4-1
Support load cell throughout handling in non-vertical positions
Figure 4-2
Improper handling may functionally destroy the load cell
Installation
1.
Set the flowmeter housing in place ensuring that the flowguide and outlet gaskets are
correctly located (gaskets supplied by customer).
2.
The housing must be vertical within 1° in two planes 90° apart.
3.
Bolt the flowguide and outlet flanges to the process piping.
Summary of Contents for SITRANS WF100
Page 1: ...SITRANS Solid Flowmeters SITRANS WF100 Operating Instructions 02 2012 ...
Page 6: ...Table of contents SITRANS WF100 4 Operating Instructions 02 2012 7ML19985NB01 01 ...
Page 8: ...Introduction SITRANS WF100 6 Operating Instructions 02 2012 7ML19985NB01 01 ...
Page 26: ...Installing Mounting SITRANS WF100 24 Operating Instructions 02 2012 7ML19985NB01 01 ...
Page 28: ...Connecting SITRANS WF100 26 Operating Instructions 02 2012 7ML19985NB01 01 ...
Page 32: ...Commissioning SITRANS WF100 30 Operating Instructions 02 2012 7ML19985NB01 01 ...
Page 42: ...Technical data SITRANS WF100 40 Operating Instructions 02 2012 7ML19985NB01 01 ...
Page 44: ...Dimension drawings SITRANS WF100 42 Operating Instructions 02 2012 7ML19985NB01 01 ...