5.2.4
Preparing the mating faces
Prepare the foundation faces dependent on the machine type:
● Mounting on a foundation
– Ensure that the foundation faces are flat and free of contaminations.
– Check the dimensions of the mounting-foot holes.
● Flange connection
– Clean the flange before installation. Ensure that the flange surfaces are flat and perfectly
clean.
– Check the geometry of the flange.
● Wall mounting
– Ensure that the wall faces are flat and free of contaminations.
– Check the dimensions of the mounting-foot holes.
– Support the machine from below, e.g. using a wall bracket or by bolting it.
5.3
Lift the machine to where it will be installed, and position it
5.3.1
Preconditions for correct alignment and secure attachment
Detailed specialist knowledge of the following measures is required in order to correctly align
and securely fit the equipment.
● Preparing the foundation
● Selecting and mounting the coupling
● Measuring the concentricity and axial eccentricity tolerances
● Positioning the machine
If you are not familiar with the prescribed measures and procedures, then you can make use
of the services offered by the local Service Center (Page 117).
Assembly
5.3 Lift the machine to where it will be installed, and position it
SIMOTICS HT Series HT-direct 1FW4...1......A
50
Operating Instructions 11/2018
Summary of Contents for SIMOTICS HT Series
Page 2: ...13 11 2018 16 25 V5 00 ...
Page 10: ...Table of contents SIMOTICS HT Series HT direct 1FW4 1 A 10 Operating Instructions 11 2018 ...
Page 26: ...Description SIMOTICS HT Series HT direct 1FW4 1 A 26 Operating Instructions 11 2018 ...
Page 118: ...Service and Support SIMOTICS HT Series HT direct 1FW4 1 A 118 Operating Instructions 11 2018 ...
Page 122: ...Quality documents SIMOTICS HT Series HT direct 1FW4 1 A 122 Operating Instructions 11 2018 ...
Page 127: ......