
The necessary ESD protective measures for electrostatic sensitive devices are illustrated once
again in the following drawings:
6HDWLQJSRVLWLRQ
6WDQGLQJSRVLWLRQ
6WDQGLQJVHDWLQJSRVLWLRQ
E
E
D
F
D
I
I
I
I
I
D
F
F
H
G
G
H
G
a = conductive floor surfaceb = ESD table
c = ESD shoes
d = ESD overall
e = ESD wristband
f = cabinet ground connection
2.7
Interference immunity
By selecting suitable signal cables and evaluation units, ensure that the interference immunity
of the machine is not diminished.
2.8
Interference voltages when operating the converter
Interference voltages when operating the converter
When a converter is in operation, the emitted interference varies in strength depending on the
converter (manufacturer, type, interference suppression measures undertaken). On machines
with integrated sensors (e.g. PTC thermistors), interference voltages caused by the converter
may occur on the sensor lead. This can cause faults which can result in eventual or immediate
death, serious injury or material damage.
● Comply with the EMC information provided by the manufacturer of the converter. This is
how you prevent the limit values stipulated by IEC/EN 61000-6-3 for the drive system
(consisting of the machine and converter) from being exceeded.
● You must put appropriate EMC measures in place.
2.9
Electromagnetic fields when operating electrical power engineering
installations
Electrical power equipment generate electromagnetic fields during operation. Potentially lethal
malfunctions can occur in medical implants, e.g. pacemakers, in the vicinity of electrical power
equipment. Data may be lost on magnetic or electronic data carriers.
● Protect the personnel working in the plant by taking appropriate measures, such as erecting
identifying markings, safety barriers and warning signs and giving safety talks.
● Observe the nationally applicable health and safety regulations.
Safety information
2.7 Interference immunity
SIMOTICS HT Series HT-direct 1FW4...1......A
18
Operating Instructions 11/2018
Summary of Contents for SIMOTICS HT Series
Page 2: ...13 11 2018 16 25 V5 00 ...
Page 10: ...Table of contents SIMOTICS HT Series HT direct 1FW4 1 A 10 Operating Instructions 11 2018 ...
Page 26: ...Description SIMOTICS HT Series HT direct 1FW4 1 A 26 Operating Instructions 11 2018 ...
Page 118: ...Service and Support SIMOTICS HT Series HT direct 1FW4 1 A 118 Operating Instructions 11 2018 ...
Page 122: ...Quality documents SIMOTICS HT Series HT direct 1FW4 1 A 122 Operating Instructions 11 2018 ...
Page 127: ......