NOTICE
Storage
The motor can be damaged if you use it or store it unprotected outdoors.
• Protect the motor against intensive solar radiation, rain, snow, ice and dust. Use a
superstructure or additional cover, for example.
• If required, contact the service center, or technically coordinate outdoors use.
4.5.5
Commissioning after storage
4.5.5.1
Insulation resistance and polarization index
Measuring the insulation resistance and polarization index (PI) provides information on the
condition of the machine. It is therefore important to check the insulation resistance and the
polarization index at the following times:
• Before starting up a machine for the first time
• After an extended period in storage or downtime
• Within the scope of maintenance work
The following information is provided regarding the state of the winding insulation:
• Is the winding head insulation conductively contaminated?
• Has the winding insulation absorbed moisture?
As such, you can determine whether the machine needs commissioning or any necessary
measures such as cleaning and/or drying the winding:
• Can the machine be put into operation?
• Must the windings be cleaned or dried?
Detailed information on testing and the limit values can be found here:
"Testing the insulation resistance and polarization index"
4.5.5.2
Lubricating the rolling bearings
If you correctly store the machine for a longer period of time, it can be assumed that within a
period of two years, the grease in the bearings will not deteriorate.
• For motors with thermal class 155, for normal ambient temperatures, use a lithium-soap
rolling bearing grease with a melting point of at least 180° C.
• For machines with thermal class 180, and for certain special machines, use the special grease
specified on the machine lubricant plate.
Preparing for use
4.5 Transport and storage
1FU9
Operating Instructions, 07/2020, A5E46712792A
31
Summary of Contents for SIMOTICCS A 1FU9
Page 1: ...Operating Instructions 1FU9 SIMOTICS A 07 2020 Edition Synchronous motors www siemens com ...
Page 2: ......
Page 58: ...Assembly 5 6 Installing the machine 1FU9 56 Operating Instructions 07 2020 A5E46712792A ...
Page 80: ...Commissioning 7 3 Switching on 1FU9 78 Operating Instructions 07 2020 A5E46712792A ...
Page 110: ...Spare parts 1FU9 108 Operating Instructions 07 2020 A5E46712792A ...
Page 120: ...Technical data B 1 Tightening torques 1FU9 118 Operating Instructions 07 2020 A5E46712792A ...
Page 124: ...Index 1FU9 122 Operating Instructions 07 2020 A5E46712792A ...
Page 125: ......