Connecting
8.1 Safety instructions and guidelines
SIMATIC PN/CAN LINK
Operating Instructions, 03/2022, A5E39895388-AC
87
Cable routing and grounding
Note
Electromagnetic interference
Make sure that sufficient potential equalization is implemented in all plants or systems in
which the PN/CAN LINK is installed. E.g. by means of a low-impedance connection to a
ground potential.
Note
Strain relief
Ensure that all cables and leads that protrude externally are equipped with adequate strain
relief.
Other requirements
NOTICE
Damaged cables
•
The cables must be suitably dimensioned to ensure that they cannot be damaged. Make
sure that the cables are suitable for the individual application.
•
Observe the bending radii.
CAUTION
For system for UL approval:
The cables must be specified for an ambient temperature of at least +75 °C.
Summary of Contents for SIMATIC PN/CAN LINK
Page 1: ......