Installing the Device
2.2 Unpacking the Device
ment ratings. Make sure to review all operating and installation instructions before
commissioning or performing maintenance on the device.
1.
Review the relevant certification information for any regulatory require-
ments.
For more information, refer to
.
2.
Unpack and inspect the device.
For more information, refer to
"Unpacking the Device (Page 8)"
.
3.
Mount the device.
For more information, refer to
"Mounting the Device (Page 8)"
.
4.
Connect the failsafe alarm relay.
For more information, refer to
"Connecting the Failsafe Alarm Relay (Page
5.
Connect power to the device and ground the device to safety Earth.
For more information, refer to
6.
Connect the device to the network.
For more information, refer to
7.
Configure the device.
For more information, refer to
"Configuring the Device (Page 18)"
.
2.2
Unpacking the Device
When unpacking the device, do the following:
1. Inspect the package for damage before opening it.
2. Visually inspect each item in the package for any physical damage.
3. Verify all items are included.
NOTICE
If any item is missing or damaged, contact Siemens for assistance.
2.3
Mounting the Device
The RUGGEDCOM RS400F is designed for maximum mounting and display flexibili-
ty. It can be equipped with connectors that allow it to be installed in a rack, on a DIN
rail, or directly on a panel.
IMPORTANT
Heat generated by the device is channeled outwards from the enclosure. As such, it
is recommended that 2.5 cm (1 in) of space be maintained on all open sides of the
device to allow for some convectional airflow.
8
RUGGEDCOM RS400F
Installation Manual, 02/2020, C79000-G8976-1341-04