Commissioning the device
3.2 General information on commissioning
SIMATIC ITP1000
Operating Instructions, 05/2017, A5E37340160-AB
31
Write down identification data
1.
Transfer the identification data in the table shown below into the "Value" column.
In the "Source" column you can find information on where you can find the required value.
Identification date
Source
Value
Order number
Rating plate
6AV...
Serial number
Rating plate
S VP...
Product Key
(Microsoft Windows Product Key)
COA-label
Ethernet address 1
SCU > (Page 84)
Menu "Advanced" > "Peripheral
Configuration"
3.2
General information on commissioning
NOTICE
Risk of damage to the device!
Make sufficient allowances for the device to warm up to room temperature before you put it
into use. If condensation develops, wait at least 12 hours before switching on the device.
Requirements for commissioning
●
The power supply is connected or the battery is fully charged.