Preparing and backing up a project
7.2 Transfer
OP 73micro, TP 177micro (WinCC flexible)
94
Operating Instructions, 09/2007, 6AV6691-1DF01-0AB0
7.2.3
Testing a project
Introduction
There are two options on the HMI device testing a project:
●
Offline testing of the project
Offline testing means that communication between the HMI device and PLC is down
while the test is being carried out.
●
Online testing of the project
Online testing means that the HMI device and PLC communicate with each other during
testing.
Perform both tests, starting with the "Offline test", followed by the "Online test".
Note
You should always test the project on the HMI device on which the project will be used.
Check the following:
1.
Check the correct layout of the screens.
2.
Check the screen structure.
3.
Check the input objects.
4.
Enter the tag values.
The test increases the certainty that the project will run error-free on the HMI device.
Requirements for the offline test
●
The project has been transferred to the HMI device.
●
The HMI device is in "Offline" mode.
Procedure
In "Offline" mode, you can test the various project functions on the HMI device without them
being affected by the PLC. PLC tags, therefore, are not updated.
Test the operator control objects and visualization of the project as far as possible without
connecting to the PLC.
Requirements of the online test
●
The project has been transferred to the HMI device.
●
The HMI device is in "Online" mode.
Procedure
In "Offline" mode, you can test the various project functions on the HMI device without them
being affected by the PLC. PLC tags are updated in this case.
Test the operator control objects and views of the project.
See also
Setting the operating mode (Page 90)