3-1
SIMATIC Field PG Manual
A5E00075760-04
Configuring And Operating The SIMATIC
Field PG
What Does This Chapter Contain?
The chapter below describes all tasks required to successfully set up your
workplace. These include:
•
initial steps for commissioning your SIMATIC Field PG,
•
working with battery operation and replacing the battery,
•
connecting peripheral devices,
•
working with memory submodules for the PLC and
•
connecting your PG to other devices.
Chapter Overview
Section
Description
Page
3.1
Unpacking and Setting Up the SIMATIC Field PG
3.2
Connection to the Power Supply
3.3
Battery Operation
3.4
Commissioning
3.5
Panel “Field PG”
3.6
Connecting Peripheral Devices
3.7
Working with SIMATIC-S5 memory submodules
3.8
Working with SIMATIC Memory Cards
3.9
Working with Micro Memory Cards
3.10
Working with PC Cards
3.11
Connecting the Field PG to a SIMATIC S5 Network
3.12
Connecting the Field PG to a SIMATIC S7 Network (MPI/DP)
3.13
Networking the Field PG with Other Stations on PROFIBUS
3.14
Ethernet (RJ45 Ethernet Interface)
!
Warning
When connecting long signal lines (especially for plant-wide connections), make
sure that the signal lines are connected to the local equipotential grounding system
(cable shield connected to protective conductor).
3
Summary of Contents for Simatic Field PG
Page 8: ...Preface viii SIMATIC Field PG Manual A5E00075760 04 ...
Page 12: ...Contents xii SIMATIC Field PG Manual A5E00075760 04 ...
Page 18: ...Important Notes 1 6 SIMATIC Field PG Manual A5E00075760 04 ...
Page 90: ...Error Diagnostics 6 2 SIMATIC Field PG Manual A5E00075760 04 ...
Page 124: ...Technical Specifications B 6 SIMATIC Field PG Manual A5E00075760 04 ...