Building Technologies
74 319 0620 0 a
17.04.2008
32/152
en
174 Pump overrun time
6 min
(0…40)
................
min
175 Pump
kick
0
(0 / 1)
.........................
0 = no periodic pump run
1 = weekly pump run active
176 Changeover
winter-/
summertime
25.03
(01.01 … 31.12)
…......................
Setting: Earliest possible
changeover time
177 Changeover
sum-
mer-/ wintertime
25.10
(01.01 … 31.12)
…......................
Setting: Earliest possible
changeover time
178 Clock
operation
0
(0…3)
.........................
0 = autonomous clock in the
controller
1 = time from bus; clock (slave)
with no remote setting
2 = time from bus; clock (slave)
with remote setting
3 = time from bus; central clock
(master)
179 Bus
supply
A
(0 / A)
.........................
0 = no bus supply through the
controller
A = bus supply through the
controller
180 Outside
tempera-
ture source
A
(A / 00.01…14.16)
.........................
When from data bus:
Enter segment and device
number of source,
or
enter A, in which case the
source is automatically ascer-
tained
Block "Contact H2"
184 Function when
terminals H2–M are
linked
0
(0 / 1)
.........................
0 = heat demand signal to heat
source
1 = heat demand signal to
heating circuit