CE1P2522E / 30.03.2000
Basic Documentation RVL470
Siemens Building Technologies
INDEX-4
Alphabetical list of operating lines
Landis & Staefa Division
Alphabetical list of operating lines
Function, setting, display
Operating line
Page
A
Actuator running time
85
29
Amplification of locking signal
173
42
B
Boost of room temperature setpoint
71
18
Building time constant
63
18
Bus power supply
179
42
C
Clock operation
178
42
Controller's software version
195
53
D
Date
40
15
Date of first day of holidays
12
13
Date of last day of holidays
13
13
Demand for heat when connection terminals H2–M are linked
186
53
Device number
169
42
E
Effect when connection terminals H2–M are linked
185
53
Excess temperature mixing valve / heat exchanger
84
29
F
Faults
50
15
Flow alarm
171
42
Flow temp. setpoint for frost protection for the plant
168
42
Flow temperature setpoint
165
42
Function when terminals H2–M are linked
184
52
G
Gain factor for room temperature influence
70
18
H
1st heating period, start of NORMAL heating
5
13
1st heating period, start of REDUCED heating
6
13
2nd heating period, start of NORMAL heating
7
13
2nd heating period, start of REDUCED heating
8
13
3rd heating period, start of NORMAL heating
9
13
3rd heating period, start of REDUCED heating
10
13
Heating curve, flow setpoint TV1 at 15 °C outside temperature
14
13
Heating curve, flow setpoint TV2 at –5 °C outside temperature
15
13
Heating limit for NORMAL heating (ECO day)
61
18
Heating limit for REDUCED heating (ECO night)
62
18
Holiday period 1...8
11
13
Hours run counter
194
53
I
Identification code of room unit
196
53
Integral action time of control (Tn)
87
29