123/130
Siemens Building Technologies
Basic Documentation RVD230
CE1P2383de
HVAC Products
Alphabetical list of operating lines
27.05.2004
Alphabetical list of operating lines
Function, setting, display
Operating line
Page
A
Active slaves on the PPS
156
91
Assignment of d.h.w. heating
125
80
Assignment of variable speed pump control
57
36
B
Baud rate
153 89
Building time constant
62
41
Bus power supply, operating mode and status indication
134
81
C
Circulating pump for d.h.w. charging
120
77
Circulating pump operation during legionella function
128
74
Clock mode
133 81
Closing time actuator of d.h.w. circuit
112
77
Cooling down protection primary flow
192
100
Current room temperature setpoint
1
29
D
D.h.w. priority
106 62
D.h.w. temperature
26
33
Date
15 31
Date of first day of holiday
32
34
Date of last day of holiday
33
34
Derivative action time of d.h.w. control
115
77
Device number for bus address
131
81
Display of active limitations
169
92
Display of digital inputs
165
92
Display of setpoint
162
92
Dwelling time at legionella setpoint
127
74
E
Effect of the room temperature (gain factor)
70
41
End of heating period 1
8
29
End of heating period 2
10
29
End of heating period 3
12
29
End of release period 1
19
32
End of release period 2
21
32
End of release period 3
23
32
External heat demand
87
57
Extra overrun time of charging pump
108
62
F
Flow alarm
143 85
Flow temperature heating circuit
27
33
Forced charging at the beginning of release phase 1
191
100
Frost protection for the plant
142
85
Function of circulating pump
54
36