Chapter 2
Installing Device
RUGGEDCOM M2200
Installation Guide
8
Unpacking the Device
1. Review the relevant certification information for any regulatory requirements. For more information, refer to
2. Mount the device.
3. Connect the failsafe alarm relay.
4. Connect power to the device and ground the device to safety Earth.
5. Connect the device to the network.
6. Configure the device.
Section 2.2
Unpacking the Device
When unpacking the device, do the following:
1. Inspect the package for damage before opening it.
2. Visually inspect each item in the package for any physical damage.
3. Verify all items are included.
IMPORTANT!
If any item is missing or damaged, contact Siemens for assistance.
Section 2.3
Mounting the Device
The RUGGEDCOM M2200 is designed for maximum mounting and display flexibility. It can be equipped with
connectors that allow it to be installed in a 48 cm (19 in) rack or directly on a panel.
IMPORTANT!
Heat generated by the device is channeled outwards from the enclosure. As such, it is recommended
that 2.5 cm (1 in) of space be maintained on all open sides of the device to allow for some
convectional airflow.
Forced airflow is not required. However, any increase in airflow will result in a reduction of ambient
temperature and improve the long-term reliability of all equipment mounted in the rack space.
NOTE
For detailed dimensions of the device with either rack or panel hardware installed, refer to
.
CONTENTS
•
Section 2.3.1, “Mounting the Device to a Rack”
•
Summary of Contents for RUGGEDCOM M2200
Page 4: ...RUGGEDCOM M2200 Installation Guide iv ...
Page 10: ...Preface RUGGEDCOM M2200 Installation Guide x Customer Support ...
Page 16: ...Chapter 1 Introduction RUGGEDCOM M2200 Installation Guide 6 Supported Fiber Optic Cables ...
Page 28: ...Chapter 2 Installing Device RUGGEDCOM M2200 Installation Guide 18 Wiring Examples ...
Page 42: ...Chapter 5 Technical Specifications RUGGEDCOM M2200 Installation Guide 32 Dimension Drawings ...