SIEMENS
CF62 Level 2 Service Manual
Copyright © Siemens Mobile
SSMC MD CCQ
All rights reserved
24 of 42
Internal Service Use Only
Siemenes Shanghai Technical Support Center
C:
Press the Metal dome to ensure it is properly
glued on the PCB (main board), then prepare a
new Keypad
.
D:
Place the new Keypad in the assembled Base upper
assembly with the glue surface upwards, Detach the
protection foil from the new Keypad with the
tweezers.
E:
Place the assembled PCB (main board) onto the
assembled Base upper assembly with the
Keypad through the three pins(marked with
arrows), which align the PCB on the correct
position.
F:
Remove the PCB Assembly by holding it alongside
the center and lifting it straight up, Press the Keypad
to make it glued properly.
Step 4:
Place the PCB Assembly onto the Base upper assembly. The three pins (marked with arrows) align the
PCB Assembly in its correct place.