![Siemens CERBETUS PYROTRONICS VDT Operation And Installation Manual Download Page 15](http://html.mh-extra.com/html/siemens/cerbetus-pyrotronics-vdt/cerbetus-pyrotronics-vdt_operation-and-installation-manual_382782015.webp)
VDT Interface for the MXL
12
FROM PIM-1
TO MXL-VDT(80-132)
Terminal No.
Signal
Pin no.
Signal
4
RxD
2
TxD
5
TxD
3
RxD
2
SigGnd
7
SigGnd
FROM PIM-1
TO MXL-VDT(80-132)
Pin No.
Signal
Pin No.
Signal
4
RxD
2
TxD
5
TxD
3
RxD
2
SigGnd
7
SigGnd
3
Printer Busy
11
SCA
COMMUNICATION SETUP
Characteristic
Setting
Main Baud Rate
Per CSG-M (default 1200 baud)
Main Data/Parity
Per CSG-M (default 8 data bits/no parity)
Main Stop Bits
Per CSG-M (default 1 stop bit)
Ignore 8th Bit
On
Main Rcv Hndsk
None
Main Xmt Hndsk
None
Comm Mode
Full Duplex
Disconnect
2 seconds
Use the following minimum cabling requirements when connecting a
supervised interactive terminal to an MXL System.
PIM-1 to MXL-VDT (80-132)
Minimum Cabling Requirements
PIM-1 to TI-82OKSR
Minimum Cabling Requirements
Technical Manuals Online! - http://www.tech-man.com
firealarmresources.com