Result
The test is passed if the circuit breaker settings match what is specified in the circuit diagram.
3.1.7
Dimensions
Fundamentals
The drive dimensions are measured. The basis for the visual inspection is the order-specific
dimension drawing.
Test procedure
1. The external dimensions, length, width and height of the drive are measured.
Result
The test is passed if the dimensions match with what is specified in the dimension drawing.
3.1.8
Fiber-optic cables in the power section
Fundamentals
The fiber-optic cables are visually inspected to ensure that they have been installed as
specified in the circuit diagram and are correctly connected to the control module.
Test procedure
1. The following is inspected:
– Have edge protectors been attached to sharp edges?
– Does the cable installation correspond to the circuit diagram?
– Are the fiber-optic cables correctly connected to the control module? The white marking
on the fiber-optic cable must be just about visible.
Result
The inspection is passed if the cable installation does not exhibit any deficiencies and matches
the information in the circuit diagram.
3.1.9
Clamping pressure on the power semiconductor stack in the power section
Fundamentals
The clamping pressure on the power semiconductor stack is tested with a preclamping gage.
Tests
3.1 Visual inspection
SINAMICS SL150 6SL3860 F03 F70 F98 F79 F76
Reference Manual Rev.201902141425 SL150 luftgekühlt
21