Maintenance
54
9229 9862 176 0D
2013-08-28
Maintenance plan
continued on next page
No.
Work to be done
Operating and auxil-
iary materials
Frequency
Remarks
an
nu
ally
e
v
er
y 10
,0
00
*
)
e
v
er
y 30
,0
00
*
)
af
te
r 60
,0
00*
)
*
)
mechanical operating
cycles
1.
Vacuum circuit-breaker
1.1
Clean insulating parts and outer
parts
Warm water, house-
hold cleaners
x
Note 1)
1.2
Grease all bearing points and sliding
surfaces as per Fig. 70 and Fig. 69.
Perform 3 to 5 mechanical test
switching operations after greasing
Isoflex Topas L32
Shell Tellus Oil 32
x
See Fig. 70 and Fig. 69
Note 2), 3), 6)
1.3
Check all electrical operating materi-
als in the drive for correct functioning
x
1.4
Check line connections for tight seat
x
1.5
Check all screw connections and
locking elements for tight fit and
check for completeness
x
2.
Pole assembly
2.1
Exchange vacuum interrupters
x
Possibly depending on the
electrical operating cycle
number as per “Interrupter
service life”,
Note 4)
x
Only for 3AH4305-7,
3AH4305-8, 3AH4306-7,
3AH4306-8 maintenance at
the Siemens plant
2.2
Exchange spring guide and insulat-
ing operating rod
x
Note 4)
2.3
Angle lever
x
Only for 3AH4305-7,
3AH4305-8, 3AH4306-7,
3AH4306-8,
Note 4)
Summary of Contents for 3AH4
Page 4: ...4 9229 9862 176 0D 2013 08 28 Blank page ...
Page 14: ...Transport storage and packing 14 9229 9862 176 0D 2013 08 28 Blank page ...
Page 42: ...Description 42 9229 9862 176 0D 2013 08 28 Blank page ...
Page 52: ...Operation 52 9229 9862 176 0D 2013 08 28 Blank page ...
Page 60: ...Maintenance 60 9229 9862 176 0D 2013 08 28 Blank page ...
Page 62: ...Index of keywords 62 9229 9862 176 0D 2013 08 28 Blank page ...