Transport, storage and packing
9229 9862 176 0D
9
2013-08-28
•
Set the vacuum circuit-breaker down onto the square timbers.
•
Hang further sling gear into the transport boreholes.
•
Transport to installation site or leave suspended from crane for further work
steps.
Fig. 8
Positioning the square timbers and setting
down the vacuum circuit-breaker
Fig. 9
Transporting without pallet
Summary of Contents for 3AH4
Page 4: ...4 9229 9862 176 0D 2013 08 28 Blank page ...
Page 14: ...Transport storage and packing 14 9229 9862 176 0D 2013 08 28 Blank page ...
Page 42: ...Description 42 9229 9862 176 0D 2013 08 28 Blank page ...
Page 52: ...Operation 52 9229 9862 176 0D 2013 08 28 Blank page ...
Page 60: ...Maintenance 60 9229 9862 176 0D 2013 08 28 Blank page ...
Page 62: ...Index of keywords 62 9229 9862 176 0D 2013 08 28 Blank page ...