
MOBILETT Plus/ Plus E
SPR8-215.898.02
Page 6 of 6
Siemens-Elema AB
Rev. 01
01.02
SPS-UD
Solna, Sweden
7 - 6
Capacitor bank
•
If no malfunction can be detected, reinstall the module and check the remaining modules
according to the instructions above. Start with the item: "Remove the cap...".
•
Reinstall the main bars and connect them.
•
Tighten all screws and nuts on the upper side of the capacitor module with a torque of
3 Nm and all screws and nuts on the under side with a torque of 1 Nm.
•
Reattach the left and right covers and the column cover.
•
Connect the power plug and switch off S10 on D7.
•
Switch on S 1:1 on D1.
•
Read the information about the formation program P06 in section "P06 - Capacitor
formation" if you have replaced one or more capacitors.
•
Switch on the main power switch.
•
Perform a formation with program P06.
•
Switch off S 1:1 on D1.
•
Reattach the system upper cover.