Connect the condensate container (option)
•
Connect the filling level sensor to the condensate container (option)
•
Connect the valve block
•
Connect the gas connections to the analyzer system
•
Close the shut-off valve of the control gas
•
Connect the instrument air
•
Connect the power supply
•
Fit the gas sampling unit SFU
5.5
Installation sequence
5.5.1
Wall fitting
Overview
The analyzer system is delivered pre-assembled on an assembly frame.
Figure 6: Positions of the screws for wall fitting
Prerequisites
•
Observe clearances of the heated sample gas line.
•
Observe clearances for incoming and outgoing lines (approx. 55 cm clearance
above, below, to the side of the measuring device).
•
Observe clearances for maintenance work.
•
Ensure that the mounting location has sufficient load-bearing capacity.
•
Observe appropriate ambient conditions.