
32
8026957/AE00/V1-0/2021-08| SICK
O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SB30
Subject to change without notice
4
START-UP AND PARAMETER SETTINGS
4
Start-up and parameter settings
4.1
Fitting the sender/receiver unit
Assembly and installation must have been completed according to Section 3 before
starting the work described in the following.
4.1.1
Adapting the sender/receiver unit to the duct diameter
The sender/receiver unit is delivered with the short immersion depth (400 mm,
“Relation between scattering angle, immersion depth (T) and measuring volume length (L)”,
page 16
) set at the factory.
For duct diameters larger than approx. 3 m, we recommend converting the sender/receiver
unit to the long immersion depth (800 mm). The following steps are then necessary:
▸
Loosen CAMLOCK clips (1) of the sender/receiver unit, swivel electronics unit (2) to the
side and take off from mounting flange (3).
Fig. 18: Sender/receiver unit opened
The immersion depth set is displayed in the window for the measurement receiver (
“Sender/receiver unit opened”, page 32
CAMLOCK clips
Cover
Electronics unit
Plug connector
Mounting flange
Processor board
Fastening screw
Fastening screws