ASSEMBLY AND INSTALLATION
3
3.3.2
General information, prerequisites
All assembly work previously described must be completed (as far as applicable) before
starting installation work.
Carry out all installation work onsite unless otherwise explicitly agreed with SICK or
authorized representatives. This includes laying and connecting the power supply and
signal lines, installing switches and power fuses and connecting the purge air supply.
3.3.3
Connecting the optional MCU control unit
The connection of the MCU is described in the Operating Instructions of the DUSTHUNTER
SP100 (see product CD or: https://www.sick.com/de/en/dust-measuring-devices/
scattered-light-dust-measuring-devices/dusthunter-sp100/c/g64160, there you can find
the Instructions in the download area).
Observe the plug assignment when connecting the DUSTHUNTER SB30.
NOTE: Power is supplied via plug connector 1 and the RS485 bus line is connected to plug
connector 3.
3.3.4
Installing the purge air supply
▸
Lay the purge air hoses with shortest paths and free of bends, shorten as required.
▸
Maintain sufficient distance from hot duct walls.
3.3.4.1
Optional external purge air unit
1
Connect the purge air hose
▸
Connect the DN 40 purge air hose to the Y-distributor of the purge air unit and secure
with a D32-52 hose clamp.
▸
Close off the second outlet opening on the Y-distributor with the cover cap.
Fig. 13: Optional external purge air unit connection
●
Plan adequate line cross-sections (
●
Line ends with plugs to connect the sender/receiver unit must have sufficient free
length.
Optional external purge air unit
Cover cap with opening (part of the purge air reduction)
To the purge air connections of the sender/receiver unit