Page 6
STEP 2
ATTACHING THE HEAD-END STAND & TOWER WINGS
ITEMS
REQUIRED
HEAD-END
STAND
TOWER
WINGS
CARRIAGE
BOX
PARTS BAG #2
1. Set the assembled MVP Rails, right side up, atop the Carriage box, allowing the Head-End
of the Rails to overhang the box at least 18”. (Pic 2.1)
2. Place the Head end of the MVP Rails to the inside of the Head-End Stand vertical tabs, and
slide the Stand forward until the holes of each structure are aligned. Once aligned, move
the box to where the Head-End Stand can rest against it.
3. Locate the lower bolt holes (one on each side) of the Head-End Stand. Insert the 5/16” x 1
3/4” button head bolts from outside the Head-End Stand and thought the MVP Rails. Hand
tighten the 5/16” lock nuts. (Pic 2.3)
4. Locate the upper bolt holes, two on each side, of the Head-End Stand. Insert the 5/16” x
5/8” button head bolts that were attached to the Tower Wings, from inside the Rails and out
through the Head-End Stand. Hand tighten the 5/16” lock nuts. (Pic 2.4)
2.1
2.3
2.4
Summary of Contents for MVP Elite Plus
Page 2: ...Page 2 ...
Page 12: ...Page 12 7 2 7 1 7 3 7 3 7 4 7 6 7 5 ...