21
Step 7: Installation of the projection screen material.
•
Place grip rails inside the position depicted in drawing 5-7-1. Cut the rails to fit the entire length
and width of the frame.
•
Tuck the projection screen fabric into the slot by using either a metal pizza wheel
or a professional tucking tool. Start tucking the two long sides, and then finally the short sides.
Please review the UltraWeave product page online for videos.
Step 8: Installation of the supporting bar.
•
The 2-4 supporting bars (depending on size of the frame) is used to further stabilise
the inner frame.
•
Please make sure the bars does not conflict with speaker placement and attach them
where it is feasible.
Drawing 5-7-1
Grip rail
Fabric
tucking slot