SHINING 3D - EinScan Pro 2X series - EXScan Pro 3.5 - User Manual –
Nov
2020
50
Click on the project tree or on the
project button
create a new project or import a
previous fixed scan into the work.
Only projects from the same scan mode can be imported.
Imported data will be copied in the work folder and appear on the project tree
New project will create a new entry in the project tree and a new project file in the
work folder
Current project
The last loaded project is the Current project, new data will be added and align with
the current project. The current project is the last listed on the project tree.
Reopen a previous project to make it as the current project.
Rename project
Right click on the project on the tree to rename it. The new name will be updated in
the work folder
Rename projects
in case of name interference in the work folder when load a project, the loaded
project will be automatically renamed: “Name” → “Name_1”
Remove/Delete
Remove the project
Delete the selected data, group(s) or project(s)
Select one or many projects Click
remove
to remove the project(s) from the project
tree, but not from the work folder.
Click
Delete
or right click and delete to delete the selected data, group(s) or
project(s) from the project tree and the work folder.
If you remove or delete the current project the last project will reload and become
the new current project.
⚠Note:
Delete only affects the data in the work. If the project is imported from other
work, only the created copy is deleted.