INSTALLATIEHANDLEIDING – P5
VERSION 0129NM02INT01
INSTRUCTION MANUAL – P5 |
P5
06A2NM20ENG05
Wall mounting
Installation materials
& power setting
Installation &
configuration of
accessories
Required tools & additional
materials (not provided)
- 4x 6.3mm x 70mm self tapping pan
head screws (DIN 7981C) stainless steel
(A4);
- 4x plugs;
- 4x stainless steel (A4) washers;
- Drill and bit;
- Torx screwdrivers (T20);
- Voltage tester;
- Tape measure;
- Spirit level
- Power cable;
- Cable mount clips;
- RCD & MCB
- For 7,4 kW Dynamic Power
Management functionality:
cable with 2 x Ø 1,5mm
2
(minimum);
- For 22 kW Dynamic Power
Management functionality:
UTP cable (CAT5 or CAT6);
- RJ11 UTP cable crimp tool;
- 2x RJ11/RJ12 connectors;
- Cable mount clips
Package contents charge point
- Charge point;
- Rubber grommets (various sizes);
- 2x Plastic spacers;
- 1x M4 x 16 mm bolt (Torx);
- 6x M4 x 12 mm bolts (Torx)
- 2x Power cable clamps;
- 2x UTP data cable inlet with rubber seal
- Current Tranformer (only for 7,4
kW model) for Dynamic Power
Management functionality;
- Dynamic Power Management module
(only for 22 kW model) for Dynamic
Power Management functionality;
- P1 Dongle (only for 22 kW model)
for Dynamic Power Management
functionality (black)
3. PRODUCT OVERVIEW
3.1 MOUNTING, PACKAGE CONTENTS AND REQUIRED TOOLS