background image

INSTALLATIEHANDLEIDING – P3 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P3  | 

P3

06A2NM20ENG05

1.1 PRODUCT DESCRIPTION & 

INTENDED USE

Thank you for choosing a NewMotion Electric Vehicle 
(EV) Charge Point.

This charge point is intended to charge the batteries 
within EVs compatible with IEC-61851 MODE3 definition 
and requirements. Dedicated EV specific plugs will 
need to be utilised. No adaptors, conversion adaptors 
or extension sets for cables are allowed to be used. EVs 
and cables used with this charge point should always be 
undamaged and in their original state. 

1.2 SAFETY W CAUTION!

The electrical system must be voltage-free during the 
entire installation procedure. Failing to do so can lead to 
serious injury or even death. The installation procedure 
must be carried out by a trained electrician who works in 
accordance with all relevant local laws and regulations.
Do not install in potentially explosive atmospheres and/
or zones with high electromagnetic radiation and/or in 
flood-prone areas. 

The charge point is connected to the electricity grid 
and even if the equipment is switched off, hazardous 
voltages may be present at the input terminals. Always 
switch off the AC supply before starting any work on 
the charge point and/or its installation. Do not carry out 
any work in rainy conditions or when the humidity is 
above 95%. The safety guidelines are intended to ensure 
correct installation and usage. Any failure to comply with 
the valid safety guidelines or instructions provided in this 
manual may result in fire, electrocution or severe injury.

The charge point is a product in Safety Class I and 
is supplied with an earth terminal for protection 
purposes. The AC input clamps must be fitted with an 
uninterruptible earth for protection purposes. Ensure 
that the connection cables are fitted with fuses and 
circuit breakers. Never replace a protection component 
with another type. First check the full installation to 
determine if that component can be used with the 
existing installation components.

Before you switch on the charge point, check that 
the available power source matches the configuration 
settings of the product, as described in this manual.

Tripping of the RCD could be caused by an earth fault 
or a defect relay. If, after resetting the RCD, the device 
cannot be activated or immediately trips again; please 
contact your installer.

1.3 LEGAL DISCLAIMER

This manual is created for you with care.  
We however do not guarantee that all information is 
complete, accurate and correct. 

If you find any unclarities or mistakes in this installation
manual, or if you have any feedback or suggestions in
general about this manual, please inform us at
[email protected] and 
mention the document version in the subject.

Please check our website  

go.newmotion.com/installationmanuals

  

for the latest version of this manual.

NewMotion strongly advises to have the product 
installed by EV-Ready certified professionals. How 
the product should be installed and used depends on 
local circumstances and local and national regulation, 
which are not mentioned in our manual. NewMotion 
is not responsible for any loss or damage whatsoever 
caused – including without limitation, any indirect, 
personal or consequential loss or damage – arising 
from or in connection with the use of this manual. Nor 
does NewMotion accept any liability for any such loss or 
damage arising out of your reliance on any information 
contained in this manual.

1. INTRODUCTION

Summary of Contents for NewMotion Home Advanced 2.2

Page 1: ...100 cm Home Basic Edition 7 Home Basic Edition 22 VERSION 06A2NM20ENG05 2020 INSTRUCTION MANUAL EN...

Page 2: ......

Page 3: ...rth terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breake...

Page 4: ...MANUAL P4 P4 06A2NM20ENG05 This selected charge point is not connected to a back office No online services or remote support are available for this charge point In case of an error or issue on site su...

Page 5: ...ty cable with 2 x 1 5mm2 minimum For 22 kW Dynamic Power Management functionality UTP cable CAT5 or CAT6 RJ11 UTP cable crimp tool 2x RJ11 RJ12 connectors Cable mount clips Package contents charge poi...

Page 6: ...529 IP code protection class Certificates User interface Identification start charging Configuration Backoffice protocol Stand by consumption 06A _ _ _ _ _ _ 06B _ _ _ _ _ _ Home Basic Edition 7 singl...

Page 7: ...lled outdoors with a road proximity less then 5 meters 3 2 TECHNICAL SPECIFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS 22 KW MODEL ONLY Operating temperature range Operating humidit...

Page 8: ...HANDLEIDING P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 06A2NM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2 EV Plug socket Cover lid Identification label with serial number LED statu...

Page 9: ...2INT01 INSTRUCTION MANUAL P9 P9 06A2NM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS 7 4 KW VERSION Neutral wire connection Phase wire connection Earth wire connection Power cable Cable clam...

Page 10: ...2 OVERVIEW OF CONNECTIONS 22 KW VERSION Phase 1 Phase 2 Phase 3 Power cable inlet Cable clamp Earth Earthing pole If connecting to a 3 phase grid without neutral only install 1 phase and connect one...

Page 11: ...RIES Dynamic Power Management cable or CT cable inlet 7 4 kW model 2x 1 5 mm2 cable 22 kW model CAT5 6 UTP cable 22 kW model RJ12 P1 port for Dynamic Power Management 7 4 kW model CT connection for Dy...

Page 12: ...kness appropriate for the specific situation and according to regulations 3 phase charge point can also be connected to 1 phase In this case the charge point can only charge on 1 phase The electrician...

Page 13: ...ed in 3 4 1 Overview of Connections 7 4 kW or 3 4 2 Overview of Connections 22 kW Version 5 4A DYNAMIC POWER MANAGEMENT CT FOR 7 4 KW MODEL The Current Transformer for Dynamic Power Management include...

Page 14: ...nstalling Accessories section If both ends of the UTP cable are properly connected to the charge point Dynamic Power Management module and powered the P1 LED will indicate whether the connection is co...

Page 15: ...0 16 A 1 20 A 2 25 A 3 32 A 4 16 A 5 20 A 6 25 A 7 32 A Table 1 1 Maximum allowed current 6 LOCAL CONFIGURATION 6 2 DYNAMIC POWER MANAGEMENT SETTING Enable Dynamic Power Management if the CT for 7 4 k...

Page 16: ...E POINT If so it means your car won t charge when plugged in To fix this issue turn off the Mechanical Circuit Breaker in the fuse box wait 15 seconds and turn it back on DOES YOUR CAR CHARGE VERY SLO...

Page 17: ......

Reviews: