background image

INSTALLATIEHANDLEIDING – P14 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P14  | 

P14

06A2NM20ENG05

Step 4: Connect the power adapter to the Dynamic 
Power Management module. One of the two power 
adapter wires has a broken white stripe. This wire is the 
power adapter GND and should therefore be connected 
to the GND pin (right) on the module. The other wire is 
the +5 Volts and should be connected to the +5V pin 
(left) on the module. The middle pin is not used;
Step 5: Plug the power adapter of the Dynamic Power 
Management Module into a power outlet. The PWR LED 
must light up;
Step 6: The CS LED will (after a few seconds) indicate a 
measured current after the power is on;
Step 7: Clamp a RJ12 connector straight to the UTP 
cable for Dynamic Power Management;
Step 8: Feed the UTP cable(s) through the rubber stop(s) 
on the data cable inlet of the charge point, as indicated 
in section ‘3.4.1 Overview of Connections’;
Step 9: Clamp a RJ12 connector straight to the UTP 
cable for Dynamic Power Management;
Step 10: Check if the RJ12 connectors are OKAY with a 
network cable tester;
Step 11: Plug the RJ12 cable in the black P1 dongle, 
which is included in the box. Plug the P1 dongle in the 
Dynamic Power Management module.
Step 12: Connect it to the P1 port, as indicated in the 
’3.4.3 Overview Installing Accessories’ section; 

If both ends of the UTP cable are properly connected to
the charge point & Dynamic Power Management module 
and powered, the P1 LED will indicate whether the 
connection is correct. If the P1 LED does not show any 
signal, please check if the RJ12 connectors are properly 
connected using a network cable tester. If the led of the 
P1 port of the charge point is blue, the Load Shedding 
is functioning. If it is red, the P1 dongle is forgotten. If 
there is no led on the P1 port, the cable is not correctly 
connected.

5.5 CHARGE POINT CONFIGURATION

Charge point configuration should be done before the 
charge point is powered on. To configure charge point 
features such as Dynamic Power Management, please 
follow the instructions as described in chapter 6 of this 
installation manual.

5.6 FINISHING UP (CLOSE 

ENCLOSURE)

Step 1: Check and make sure that the rubber seal 
around the casing is properly in place on the edge;
Step 2: Place the cover on the charge point;
Step 3: Hand-tighten the four M4 x 12 mm bolts 
provided around the socket so that the cover closes on 
the rubber seal but the rubber seal does not deform;
Step 4: Hand-tighten the other two M4 x 12 mm bolts 
provided in the bottom of the cover;
Step 5: Turn the socket lid clockwise in the cover and 
hand-tighten the M4 x 20 mm bolt provided;
Step 6: Switch on power to the charge point;
Step 7: Wait until charge point is fully started up (+/-10 
minutes, LED should be off).

5. INSTALLATION PROCEDURE

Summary of Contents for NewMotion Home Advanced 2.2

Page 1: ...100 cm Home Basic Edition 7 Home Basic Edition 22 VERSION 06A2NM20ENG05 2020 INSTRUCTION MANUAL EN...

Page 2: ......

Page 3: ...rth terminal for protection purposes The AC input clamps must be fitted with an uninterruptible earth for protection purposes Ensure that the connection cables are fitted with fuses and circuit breake...

Page 4: ...MANUAL P4 P4 06A2NM20ENG05 This selected charge point is not connected to a back office No online services or remote support are available for this charge point In case of an error or issue on site su...

Page 5: ...ty cable with 2 x 1 5mm2 minimum For 22 kW Dynamic Power Management functionality UTP cable CAT5 or CAT6 RJ11 UTP cable crimp tool 2x RJ11 RJ12 connectors Cable mount clips Package contents charge poi...

Page 6: ...529 IP code protection class Certificates User interface Identification start charging Configuration Backoffice protocol Stand by consumption 06A _ _ _ _ _ _ 06B _ _ _ _ _ _ Home Basic Edition 7 singl...

Page 7: ...lled outdoors with a road proximity less then 5 meters 3 2 TECHNICAL SPECIFICATIONS CONTINUED 3 PRODUCT OVERVIEW P1 DONGLE SPECIFICATIONS 22 KW MODEL ONLY Operating temperature range Operating humidit...

Page 8: ...HANDLEIDING P8 VERSION 0129NM02INT01 INSTRUCTION MANUAL P8 P8 06A2NM20ENG05 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW Type 2 EV Plug socket Cover lid Identification label with serial number LED statu...

Page 9: ...2INT01 INSTRUCTION MANUAL P9 P9 06A2NM20ENG05 3 PRODUCT OVERVIEW 3 4 1 OVERVIEW OF CONNECTIONS 7 4 KW VERSION Neutral wire connection Phase wire connection Earth wire connection Power cable Cable clam...

Page 10: ...2 OVERVIEW OF CONNECTIONS 22 KW VERSION Phase 1 Phase 2 Phase 3 Power cable inlet Cable clamp Earth Earthing pole If connecting to a 3 phase grid without neutral only install 1 phase and connect one...

Page 11: ...RIES Dynamic Power Management cable or CT cable inlet 7 4 kW model 2x 1 5 mm2 cable 22 kW model CAT5 6 UTP cable 22 kW model RJ12 P1 port for Dynamic Power Management 7 4 kW model CT connection for Dy...

Page 12: ...kness appropriate for the specific situation and according to regulations 3 phase charge point can also be connected to 1 phase In this case the charge point can only charge on 1 phase The electrician...

Page 13: ...ed in 3 4 1 Overview of Connections 7 4 kW or 3 4 2 Overview of Connections 22 kW Version 5 4A DYNAMIC POWER MANAGEMENT CT FOR 7 4 KW MODEL The Current Transformer for Dynamic Power Management include...

Page 14: ...nstalling Accessories section If both ends of the UTP cable are properly connected to the charge point Dynamic Power Management module and powered the P1 LED will indicate whether the connection is co...

Page 15: ...0 16 A 1 20 A 2 25 A 3 32 A 4 16 A 5 20 A 6 25 A 7 32 A Table 1 1 Maximum allowed current 6 LOCAL CONFIGURATION 6 2 DYNAMIC POWER MANAGEMENT SETTING Enable Dynamic Power Management if the CT for 7 4 k...

Page 16: ...E POINT If so it means your car won t charge when plugged in To fix this issue turn off the Mechanical Circuit Breaker in the fuse box wait 15 seconds and turn it back on DOES YOUR CAR CHARGE VERY SLO...

Page 17: ......

Reviews: