INSIDE
INSTALLATIEHANDLEIDING – P10
VERSION 0129NM02INT01
MANUEL D’INSTALLATION – P10 |
P10
091NM20INT04
EN
NL
FR
DE
If connecting to a 230V 3-phase grid without neutral, only install 1-phase and connect one of the two other phase
wires in the neutral wire connection on the terminal block
3. PRODUCT OVERVIEW
Business Pro:
UTP data port for
connection Switch
in star configuration
or Business Lites
in daisy chain
configuration
Business Lite:
UTP data port
for daisy chain
outgoing
Business Pro:
UTP data port for
Ethernet / Mobile
router connection
Business Lite:
UTP data port for
connection switch
(star configuration) or
daisy chain incoming
Earthing pole
UTP data cable inlet
with rubber seal
UTP data cable inlet
with rubber seal
Inlet for
power cable
Power cable clamps
3.4.1 OVERVIEW OF CONNECTIONS
Phase 2
Phase 3
Phase 1
Terminal block
Neutral
Earthing
DC-protection module
Connection
DC-protection module
kWh meter