MAINTENANCE
Vacuum Diagnostic Questions
P
ump On
U
and
U
Running?
Yes or no?
V
ent Valve Closed?
The vent (backfill inlet port) must be closed before pumping down the chamber. Failure to do so may
result in damage to your vacuum pump.
V
acuum Valve Open?
The vacuum valve must be open to allow a connected vacuum supply to evacuate the oven
chamber.
D
isplay Reading?
Record the chamber pressure level showing on the Vacuum Gauge display.
Reminder
: Make sure to record the correct unit of measurement for the chamber pressure. See
topic on page 48 to verify the current unit of measurement.
Vacuum Valve
AND
Vent Valve
Summary of Contents for SHEL LAB SVAC1
Page 1: ...Installation Operation Manual SVAC1 SVAC2 SVAC4 VACUUM OVENS 110 120 Volts...
Page 6: ...6 P a g e TABLE OF CONTENTS...
Page 12: ...12 P a g e INTRODUCTION...
Page 24: ...24 P a g e RECEIVING...
Page 34: ...34 P a g e SYMBOLS...
Page 74: ...74 P a g e UNIT SPECIFICATIONS...
Page 77: ...77 P a g e PARTS LIST...