
13
|
P a g e
INSTALLATION
I
NSTALLATION
C
HECKLIST
For installing the unit in a new workspace location.
Pre-Installation
Check that the required ambient conditions and ventilation spacing for the incubator
are met, page 14.
•
Unit dimensions may be found on page 39.
Check that a suitable electrical outlet and power supply is present, page 15.
Install the Incubator in a suitable location
Review the lifting and handling instructions, page 16.
Install the incubator in its workspace location, page 16.
Make sure the incubator is level, page 16.
Set up the Incubator for use
Verify that all packaging has been removed from the incubator shelving and
incubation chamber. Adjust the shelving positions if need be, page 17.
Clean and disinfect the incubator and shelving accessories that will be placed in
the incubation chamber, page 17.
Summary of Contents for SRI3
Page 1: ...BOD INCUBATOR 110 120 Voltage 220 240 Voltage Installation Operation Manual SRI3 SRI3 2...
Page 8: ...8 P a g e INTRODUCTION...
Page 12: ...12 P a g e RECEIVING YOUR UNIT...
Page 20: ...20 P a g e GRAPHIC SYMBOLS...
Page 22: ...22 P a g e CONTROL PANEL OVERVIEW...
Page 38: ...38 P a g e USER MAINTENANCE...