16
|
P a g e
INSTALLATION
L
IFTING AND
H
ANDLING
The unit is heavy. Use appropriate lifting devices that are sufficiently rated for these loads. Follow these
guidelines when lifting the unit.
•
Lift the unit only from its bottom surface.
•
Doors, handles, and knobs are not adequate for lifting or stabilization.
•
Restrain the unit completely while lifting or transporting so it cannot tip.
•
Remove all moving parts, such as shelves and trays, and lock doors in the closed position
during transfers to prevent shifting and damage.
L
EVELING
The unit must be level and stable for safe operation.
I
NSTALL
I
NCUBATOR IN
L
OCATION
Install the unit in a workspace location that meets the criteria discussed in the previous entries of the
Installation section.
Summary of Contents for SRI3
Page 1: ...BOD INCUBATOR 110 120 Voltage 220 240 Voltage Installation Operation Manual SRI3 SRI3 2...
Page 8: ...8 P a g e INTRODUCTION...
Page 12: ...12 P a g e RECEIVING YOUR UNIT...
Page 20: ...20 P a g e GRAPHIC SYMBOLS...
Page 22: ...22 P a g e CONTROL PANEL OVERVIEW...
Page 38: ...38 P a g e USER MAINTENANCE...