INSTALLATION
A
DJUST
S
HELVES
Note:
The form factor of the shelves may vary slightly by year of production.
The unit ships with its shelves installed in the incubation chamber. Tape, foam, and other packing
dunnage is used to secure the shelves during transit and prevent damage to the chamber interior.
1.
Remove all shipping materials from the shelving.
Optional:
Shelf Adjustment
Move the shelves as needed for your application.
Figure 2: Shelf Installed
2. Install the right
side mounting
prongs first.
3. Install the left side
mounting prongs last.
1. Tilt the shelf at roughly
60° up or down when
moving to avoid
scraping the chamber
walls.
Summary of Contents for SRI3
Page 1: ...BOD INCUBATOR 110 120 Voltage 220 240 Voltage Installation Operation Manual SRI3 SRI3 2...
Page 8: ...8 P a g e INTRODUCTION...
Page 12: ...12 P a g e RECEIVING YOUR UNIT...
Page 20: ...20 P a g e GRAPHIC SYMBOLS...
Page 22: ...22 P a g e CONTROL PANEL OVERVIEW...
Page 38: ...38 P a g e USER MAINTENANCE...