![shars 101-1008 Operating Manual Download Page 9](http://html.mh-extra.com/html/shars/101-1008/101-1008_operating-manual_1255037009.webp)
Version 1.0.4 dated 2014-09-19
Page 9
Original operating instructions
The electrical specialist is specially trained for the working environment in which he is working
and knows the relevant standards and regulations.
Specialist staff
Due to its professional training, knowledge and experience as well as his knowledge of rele-
vant regulations the specialist staff is able to perform the assigned tasks and to recognise and
avoid any possible dangers himself.
Instructed persons
Instructed persons were instructed by the operating company about the assigned tasks and any
possible risks in case of improper behaviour.
1.5.2 Authorized personnel
WARNING!
Incorrect use and maintenance of the grinding machine for burins constitutes a danger
for the staff, objects and the environment.
Only authorized staff may operate the grinding machine for burins and tools!
Persons authorized to operate and maintain should be trained technical personnel and
instructed by the ones who are working for the operating company and for the manufacturer.
The operating company must
Obligations of
the
of the operat-
ing company,
train the personnel,
instruct the personnel in regular intervals (at least once a year) on
- all safety standards that apply to the machine,
- the operation,
- accredited technical guidelines,
check personnel‘s state of knowledge,
document the trainings/instructions,
require personnel to confirm participation in training/instructions by means of a signature,
check whether the personnel is working safety- and risk-conscious and observe the operat-
ing instructions.
The operator must
Obligations of
the
operator
have followed a training on the operation of the grinding machine for burins,
know the function and performance,
before taking the machine in operation
- have read and understood the operating instructions,
- be familiar with all safety devices and instructions.
Additional
requirements
regarding the
qualification
For work on the following parts there are additional requirements:
Electrical parts or operating agents: shall only be performed by an electrician or under the
guidance and supervision of an electrician.
Before starting work on electrical parts or operating agents, following measures are to be
performed in the following order.
Disconnect all poles.
Secure against switching on.
Check if the machine is zero potential.
1.6
Operators positions
The operator’s position is in front of the grinding machine for burins.