5 I
SHAN
I
INSTALLATION – REV 00
ATTENTION
All handling and lifting operations must be carried out with the greatest of care, making sure that all
personnel not involved keep at a safe distance; no-one must remain under suspended loads, whether
still or moving.
ATTENTION
As regards personal safety, installation must be performed in observance of Decree of the President of
the Republic 164/56 and Legislative Decree 494/96.
IMPORTANT
During the operations described in this manual, make sure that ONLY qualified personnel enter the
work area (see Para. 1.2 “Personnel requirements”).
ATTENTION
If the awning is installed on a floor higher than the ground floor, the person cleaning the awning must
pay greater attention to the risk of falling.
ATTENTION
If a ladder is required during installation, make sure that it is firmly placed on the ground in order to
prevent it from tipping and causing serious injury to the people involved in installation operations.
ATTENTION
Make sure there are no people, animals and objects nearby when the awning opens and closes.
Summary of Contents for SHAN
Page 1: ...Installation Manual...
Page 2: ......
Page 9: ...7 I SHAN I INSTALLATION REV 00 4 SHAN Technical sheet Fixing bracket...
Page 10: ...8I SHAN I INSTALLATION REV 00 Shan with 2 3 4 arms...
Page 18: ...SHAN Installation manual COUPLED VERSION INTEGRATION...
Page 29: ...NOTES...
Page 30: ...NOTES...